Solar Resource Map of Pakistan

The map below shows the solar energy falling on a horizontal surface of area 1 m2 during one year. It can be seen that areas of Balochistan and Southern Sindh are most gifted while Peshawar, Lahore and Islamabad also have quite favorable conditions. Lets assume that we are installing a Solar System in Karachi where the annual irradiation is around 2000 kWhr/m2. This means that there is an average daily irradiation of around 5.5 kWhr/m2. This means that a Solar Panel of area 1 m2 would receive 5.5 kWhr per day or 1 kW for 5.5 hours daily. If the above Solar Panel has an efficiency of 20% we can produce 200 Watts of electrical energy from it for 5.5 hours each day.

Solar Resource Map of Pakistan

Solar Resource Map of Pakistan

Note:
1. The above map is for energy collected by a horizontal surface. A suitably tilted surface or a tracking one can obtain significantly more energy.

2. The received energy not only depends upon the relative position of the Sun and Earth but also on the atmospheric conditions such as cloud cover during different seasons.

Can I Run My Air Conditioner on Solar

Air Conditioner on Solar

Air Conditioner on Solar

I have been asked this question many time by my friends "Can I Run My Air Conditioner on Solar". The short answer to this question is YES YOU CAN. Thompson N' Thompson HVAC, Inc provides heating and cooling Charlottesville, Virginia.

Lets assume that you have a basic air conditioning unit that is categorized as 1-ton. Now the way Air Conditioners work is that they draw a lot of current at the start, as much as three times the normal steady state current. So a 1-ton AC might be drawing only 1200 Watts at steady state, it may require as much as 3600 Watts at start up. Now there are two ways to solving this problem. Either you can put up 3600 Watts of Solar Panels on your roof and operate your system only when peak sunshine is available. Or, the better option is to have enough panels to run the AC at steady state and use some batteries to provide the initial peak current or power. These batteries will also provide back up after solar hours and when the electricity from the main grid is not available. Thermal Imaging for HVAC Efficiency can also help pinpoint airflow variations and duct leaks. By detecting these issues early, technicians can recommend remedies, preventing energy loss and potential damages like ac short cycling to your unit. Consider hiring a professional to complete the necessary repairs, such as North Florida heat pump repair services. You may also consider hiring a team of experts like rochester air conditioning maintenance services.

One company providing solar solutions in Pakistan recommends installing 1800 Watts of solar panels and 600 Ampere Hours of batteries. So assuming that we have 6 hours of peak sunshine available the solar panels would be able to run the AC for about 6 hours directly on solar energy (assuming an average power consumption of 1800 Watts). After the solar hours the battery would be charged by the main grid and can provide backup of around 4 hours (12 V x 600 Ah / 1800 W =4 hours). Also one must not forget that to convert DC voltages to AC voltages you would need an inverter and for controlling the charge and discharge cycles of the batteries a charge controller would be needed. Usually the modern solar inverters have built in charge controllers which somewhat limits the costs for air conditioner and heaters. HVAC repair and maintenance at the right time can save you money in the long run. Additionally, for more insights on financial incentives related to solar, check out this site at https://www.theinspirationedit.com/solar-rebates-a-financial-incentive-that-works-for-you/.

Upgrade your home with our residential solar installations in Texas, offering an efficient and cost-effective way to reduce your energy bills.

After going through all this technical jargon the question that needs to be answered is "How Much Would This System Cost". The answer to this is around Rs.450,000 including transportation and installation. You might think that this is too high a cost, but think of it this way, even if you are saving Rs.5000 on your electricity bill per month you would have saved enough to offset the cost in about 8 years. And a solar panel installation would last you much longer than 8 years (typically around 25 years).

Affordable Remediation and Emergency Services
Phone: (732) 540-7900
Url: https://affordableremediation.com/mold-testing-removal-remediation-in-toms-river/
1415 Hooper Ave
Toms River, NJ 08753

Wind Power - Indigenous Development Opportunities

Pakistan is blessed with solar and wind energy. We have discussed solar in our previous articles, now let us have a look at wind map of Pakistan. It can be seen from the figure below that unlike solar which is available in most parts of the country wind power is available in only limited corridors along the coast and some northern parts of the country. It is well known that a wind speed of at least 12 miles per hour (5.4 meters per second) is required for the wind turbine to work. If we look at the major cities we can say that wind power is available in the cities of Karachi,  Hyderabad, Quetta and Islamabad.

Wind Map of Pakistan

Wind Map of Pakistan

Like solar, wind projects also require a large initial investment. Wind power projects can be divided into two main categories namely on-shore and off-shore. The typical cost for these projects in the developed world, is analyzed by IRENA in a study conducted in 2012. It can be deduced from this study that for on-shore projects the cost is $1.7-$2.45 per Watt. This can be compared to price of solar for Quaid-e-Azam Solar Park Bahawalpur which is around $1.31 per Watt.  Off-shore projects require even higher initial investment, with price per Watt ranging from $3.3 to $5.0.

If we look closely at the costs for an on-shore project we see that 64% of the cost goes into the construction of wind turbines. Within this category the major cost is associated with the rotor blades and tower. These two components of the wind turbine account for more than 30% of the total cost. Other major contributor to the total cost is the foundation which accounts for 16% of the total cost. For off-shore projects the rotor blades and tower contribute about 50% to the total cost. And navigating through complex project requirements demands a keen eye for detail and an understanding of how to effectively assess potential challenges. For more insights on mastering these skills, visit https://www.commodious.co.uk/risk-assessment-training.

Wind Power Cost

Wind Power Cost

A description of the main components of the Wind Turbine is given below (reproduced from IRENE document).

Tower: These are most commonly tapered, tubular steel towers. However, concrete towers, concrete bases with steel upper sections and lattice towers are also used. Tower heights tend to be very site-specific and depend on rotor diameter and the wind speed conditions of the site. Ladders, and frequently elevators in today’s larger turbines, inside the towers allow access for service personnel to the nacelle. As tower height increases, the diameter at the base also increases.

Blades: Modern turbines typically use three blades, although other configurations are possible. Turbine blades are typically manufactured from fiberglass reinforced polyester or epoxy resin. However, new materials, such as carbon fiber, are being introduced to provide the high strength-to-weight ratio needed for the ever-larger wind turbine blades being developed. It is also possible to manufacture the blades from laminated wood, although this will restrict the size.

Generator: The generator is housed in the nacelle and converts the mechanical energy from the rotor to electrical energy. Typically, generators operate at 690 volt (V) and provide three-phase alternating current (AC). Doubly-fed induction generators are standard, although permanent magnet and asynchronous generators are also used for direct-drive designs.

Transformer: The transformer is often housed inside the tower of the turbine. The medium-voltage output from the generator is stepped up by the transformer to between 10 kV to 35 kV; depending on the requirements of the local grid.

Bottomline: For Pakistani companies interested in the indigenous development of small wind turbines (0.2kW - 100 kW) a good point to start is to develop rotor blades and towers which contribute to 30% cost of an on-shore wind power project (this increases to 50% for off-shore projects). The material used could be steel or wood which is easily available in the local market. One can also experiment with lighter materials that increase the efficiency of the system. A small wind power project of 3000 Watts can easily support all the appliances of a typical household in Pakistan (except heavy loads such as air conditioners or large freezers/refrigerators). Power and utility systems that connect organizations and homes are essential types of critical infrastructure—a realization that has not gone unnoticed by cyber criminals. This threat is only exacerbated by the modernization of OT networks that control critical infrastructure. Without traditional utility cybersecurity measures in place, these critical infrastructures are left at risk.